A Reputed OEM Project
100 m³ Silos, 60 m³ Silos, 5 to 6 Pneumatic conveying systems with conveying capacity of 10 TPH and a conveying distance of 120 mtrs. The whole Project was completed in a record time of 4 months.
Our teamwork is the ability to work together toward a common vision, the ability to direct individual accomplishments toward organizational objectives
Multiple Effect Evaporator of 200 TPD
200 TPD Zero Discharge System for affluent treatment plant in gujarat. Five effect evaporation plant for affluent completely made in SS316L. The plant consisted of evaporator calendria circulation pumps filter press etc. All design engineering supply erection commissioning were done by VG ENGINEERS PVT LTD. making the project literally torn key.
The way our team plays as a whole determines its success.
Pneumatic Conveying System Belgium
Antwerp ( Belgium ) – Five Pneumatic Conveying Systems Supplied in 2006 to one of our reputed client. The project consisted of four pneumatic conveying systems of 10 TPH and conveying distance of 120 mtrs. All equipments were supplied with C certification.
Without teamwork, there is no way that the company is going to experience success.
Malaysia (Soap Noodles Conveying System)
Four Pneumatic Conveying Systems of about 5 TPH and conveying distance of about 100 mtrs. All built in SS304. Neat and clean system with aesthetics was required for five project. The system was commissioned successfully.